Odor emissions due to biodegradation: garbage, sludge, wastewater, biogas, plastics, etc.
The year 2016:
- Project "Supply and installation of gas supply and control valve systems of Green Sai Gon sewage sludge treatment plant “ of Green Sai Gon Co, Ltd. Location: Hamlet 1, Da Phuoc Commune, Binh Chanh District, HCM City
- Project "Supply and installation of gas supply and control valve systems of Green Sai Gon sewage sludge treatment plant “ of Green Sai Gon Co, Ltd. Location: Hamlet 1, Da Phuoc Commune, Binh Chanh District, HCM City
The year 2017:
- Project "Construction and installation of Biogas system at Xuan Hoa Pig Farm 1” of Tran Minh Son Co., Ltd. Location: Xuan Hoa 1 pig farm, Xuan Hoa commune, Xuan Loc district, Dong Nai province
The year 2019:
- Project "Supplying filter system for extracting H25 and steam from biogas and installing gas supply pipeline for 400m3/h hazardous waste incinerator” of Green Sai Gon Co, Ltd. Location: Da Phuoc Cemetery, Da Phuoc Commune, Binh Chanh District, HCM CITY
The year 2020:
- Project "Supply and installation of equipment for plastic vapor odor treatment system with a capacity of 4,500m3/h” of Ebada Vina Co., Ltd. Location: Lot No. 10 - 2C, Road No. 3A, Protrade International Industrial park, An Tay Commune, Ben Cat Town, Binh Duong.